Levelling of the Navigation Line on the Augustów Canal – An Analysis of the Sluice System

Abstrakt Cover Image

Poziomowanie linii spławnej na Kanale Augustowskim – analiza systemu śluz
Levelling of the Navigation Line on the Augustów Canal – An Analysis of the Sluice System Abstrakt

Author(s): Karol Łopatecki, Adam Musiuk
Subject(s): History, Museology & Heritage Studies, Geography, Regional studies, Maps / Cartography, Other
Published by: Wydawnictwo Uniwersytetu Jagiellońskiego
Keywords: Augustów Canal; cartography in the 19th c.; hydroengineering; height measurements; cultural heritage; hydrography; Polish engineers in the 19th c.; trigonometric levelling; retrogressive method; cross-border monument

Summary/Abstract: The year 2024 marks the 200th anniversary of the commencement of construction work on the Augustów Canal. This anniversary invites us to reflect on the current state of knowledge concerning the creation of one of the most interesting hydraulic engineering projects of the first half of the 19th c. This complex has survived to the present day and, as a historical monument, is considered one of the most valuable technical monuments in Poland. In this article, we would like to address several issues related to the process of geodetic determination of ground ordinates. In cartographic terms, we presented the types of maps that had the level drawing needed to determine the route of the canal and the heights of the surrounding lakes. They testify to the use of trigonometric levelling and are an important testimony to the cartographic and engineering skills involved in the process of route reconnaissance, planning and construction of the aforementioned canal.The research method was to collect period data on the drop heights (water level differences) occurring at each lock. After converting them into metric data, we compared them to the currently collected material. It turns out that the total drop from Dębowo sluice to Niemnowo sluice was 59.09 metres, which is more than three metres higher than today. These calculations show the efforts of the builders and engineers who connected the Narew River with the Nemunas along 174.2 km of the canal. These calculations also allow us to assess the value of the retrogressive method often used in historical research.

  • Issue Year: 2025
  • Issue No: 1
  • Page Range: 103-124
  • Page Count: 22
  • Language: Polish
Toggle Accessibility Mode