A FEW TRANSFORMATIONS AND COMMENTS CONCERNING A PROGRAMME, USED IN MANAGEMENT OF TIME FOR DIFFERENT PROJECTS Cover Image

A FEW TRANSFORMATIONS AND COMMENTS CONCERNING A PROGRAMME, USED IN MANAGEMENT OF TIME FOR DIFFERENT PROJECTS
A FEW TRANSFORMATIONS AND COMMENTS CONCERNING A PROGRAMME, USED IN MANAGEMENT OF TIME FOR DIFFERENT PROJECTS

Author(s): Octavian Dan Rădescu , Nicolae Rădescu
Subject(s): Economy
Published by: Editura Universitaria Craiova
Keywords: management of time projects; decomposition graph; graph Programm;

Summary/Abstract: In the study of time management it is settled a graphe of a work programme and starting from the order relations existent between different operations, then, the way of the critical path enabled the, lets say approximative deduction of the realization date of the works’ ensemble, fluctuation intervals, etc. Actually the way of the critical path is not by itself a method of order. It is applied only for the already settled graphe programme, meaning in the moment when the order of things has been done. It’s role actually is to interpretate the graph from a temporal point of view and to give all the indications needed concerning the realization data of different events of the programme, or to enable the testing of different graphs of the same ensemble of works.Next, using a descomposition of a graph, notion that belongs to us and for which we give the determinating algorithm, we will put in a linear way all the connections between the acitivities included in the programme, which offer a good partial analysis on pieces and then the global analysis of the programme given, using the corresponding programme graph.

  • Issue Year: XXXVII/2009
  • Issue No: _
  • Page Range: 1-6
  • Page Count: 6
  • Language: English